← Back to headlines





Ghana's Energy Ministry Addresses Vulnerability of Power System
Ghana's Energy Ministry acknowledged the vulnerability of the nation's power system due to the lack of a permanent control room. The ministry stated that a temporary control room is expected to be ready by September, urging the public to bear with the current system.
20 Aug, 20:19 — 20 Aug, 20:19
Related Stories

Trump Signs Order to Rename Lake Ontario as Lake America Amid Canada Tensions
7m ago

Trump Claims Putin Assured Him Russia Will Not Attack NATO
20m ago
UN Orders Inquiry After Convicted War Criminal Ratko Mladic Dies in Custody
27m ago

French Presidential Candidates Face Off in First Economic Debate
43m ago